800 MHz Transition Administrator
Home About the TA FAQs Process Guide Site Map
Resources Reports & Metrics FCC Guidance IPS & Webinars Contacts & Requests
Resources
FCC
Guidance
FCC Orders and Notices
This section contains FCC reports, orders, and publications related to rebanding.
General FCC Orders

Mediation Orders

Waiver Request Orders

FCC Public Notices

Filings in WT Docket 02-55

TA Policy Documents

General FCC Orders
Date Title
12.09.11 In this Order, the PSHSB postponed the 800 MHz rebanding financial "true-up" date from December 31, 2011 to July 2, 2012. (DA 11-2003)
06.27.11 PSHSB dismissed a petition for reconsideration of the Bureau's decisions governing costs associated with the preparation of reports regarding the status of licensees' 800 MHz rebanding progress and licensees' eligibility to apply for vacated 800 MHz spectrum. (DA 11-1112)
06.20.11 In this Order, the PSHSB postponed the 800 MHz rebanding financial reconciliation "true-up" date from June 30, 2011 to December 31, 2011. (DA 11-1076)
04.26.11 FCC released a Notice of Proposed Rule Making (NPRM) and Order regarding the use of Terrestrial Trunked Radio (TETRA) equipment in the United States. (FCC 11-63)
02.24.11 PSHSB addressed the January 20, 2010 Petition for Declaratory Ruling (“Petition”) filed by New Jersey Transit, the City of Philadelphia, Montgomery County, and RCC Consultants (collectively, “Petitioners”) regarding the TA’s Cost Metrics. (DA 11-337)
02.18.11 Fourth Report and Order: In this Order, PSHSB adopted an 800 MHz band plan for the U.S. Virgin Islands and established a one year transition period for completion of rebanding in the USVI, which will begin on March 21, 2011 and end on March 20, 2012 (DA 11-315)
02.07.11 PSHSB dismissed or denied several petitions for reconsideration of its Third Report and Order and Third Further Notice of Proposed Rulemaking regarding the band plan for Puerto Rico (DA 11-197)
12.30.10 In this Order, the PSHSB postponed the 800 MHz rebanding financial reconciliation "true-up" date from December 31, 2010 until June 30, 2011 (DA 10-2432)
09.29.10 Fifth Report and Order (FCC 10-179) regarding cost sharing for the Broadcast Auxiliary Service (BAS) relocation
06.29.10 FCC Order (DA 10-1190) postponing financial "true-up" date until December 31, 2010.
04.26.10 FCC Third Report and Order (DA 10-695) regarding the band plan for Puerto Rico and the U.S. Virgin Islands.
03.31.10 FCC Order (DA 10-576) addressing Sprint Nextel's request for waiver of the requirement to vacate its spectrum in the interleaved band by 3/31/10.
02.05.10 Order (DA-10-235) - Extension of the Broadcast Auxiliary Service (BAS) Transition Deadline
12.23.09 FCC Order (DA 09-2624) PSHSB postpones "true-up" date until June 30, 2010.
06.24.09 FCC Order (DA 09-1395) PSHSB postpones "true-up" date until December 31, 2009.
06.12.09 FCC Report and Order ("R&O") (FCC 09-49) and Further Notice of Proposed Rulemaking - Broadcast Auxiliary Service (BAS) relocation
05.20.09 PSHSB Approves Transfer of Control of the 800 MHz Transition Administrator (DA 09-1102)
02.25.09 Fourth Memorandum Opinion and Order - New 800 MHz Band Plan for U.S.-Canada Border Regions(DA 09-422)
12.23.08 Fourth Memorandum Opinion and Order Postponing Financial "True-Up" Date Until 07.01.09 (FCC 08-276)
10.30.08 Relinquishment By Sprint Nextel of Channels in the Interleaved, Expansion, and Guard Bands (FCC 08-253)
06.30.08 Second Further Notice of Proposed Rulemaking – New 800 MHz Band Plan for Puerto Rico (DA 08-1530)
05.28.08 Erratum to "Second R&O - DA 08-1094" (DA 08-1094)
05.09.08 Second Report and Order: New 800 MHz Band Plan for U.S. - Canada Border Regions (DA 08-1094)
03.05.08 MO&O Waiving Sprint's Transition Deadline of BAS Frequencies Until 03.05.09 (FCC 08-73)
11.01.07 Further Notice of Proposed Rulemaking for US-Canada Border Region (DA 07-4489)
09.12.07 Third Memorandum Opinion and Order (FCC 07-167)
07.26.07 Erratum to "Second MO&O - FCC 07-102" (FCC 07-3403)
05.30.07 800 MHz Second Memorandum Opinion and Order (FCC 07-102)
05.18.07 800 MHz Memorandum Opinion and Order (FCC_07-92)
01.08.07 FCC Order Addressing the Disclosure and Exchange of Information among Public Safety Licensees (DA 07-27)
05.26.06 PSHSB Extends the Negotiation Period for NPSPAC Licensees in Wave 1 (FCC 06-76)
11.25.05 Erratum to "800 MHz MO&O - FCC 05-174" (DA 05-3061)
10.05.05 800 MHz Memorandum Opinion and Order (FCC 05-174)
01.19.05 Erratum to "Supplemental Order to 800 MHz R&O - FCC 04-294"
12.22.04 Supplemental Order to "800 MHz R&O - FCC 04-168" (FCC 04-294)
10.06.04 Second Erratum to "800 MHz Report & Order - FCC 04-168"
09.10.04 Erratum to "800 MHz Report & Order," FCC 04-168
08.06.04 800 MHz Report and Order, Fifth R&O, Fourth MO&O, and Order (FCC 04-168)

Back to top

FCC Mediation Orders
Date Title
04.20.12 County of Genesee, New York (DA 12-624)
03.06.12 Port Authority of New York and New Jersey (DA 12-206)
11.03.11 County of Oakland, Michigan (County of Genesee, New York proceeding) (DA 11-1846)
11.02.11 State of Oklahoma (DA 11-1839)
10.28.11 County of Genesee, New York (DA 11-1808)
09.09.11 County of Genesee, New York (DA 11-1521)
07.29.11 Illinois Public Safety Agency Network (DA 11-1310)
05.25.11 Broward County, Florida (DA 11-944)
04.26.11 City of Overland Park, Kansas (DA 11-717)
04.08.11 TeleBEEPER of New Mexico, Inc. (DA 11-640)
04.04.11 State of Indiana (DA 11-604)
03.23.11 Illinois Public Safety Agency Network ("IPSAN") (DA 11-543)
03.10.11 State of Indiana: Motion for Stay (DA 11-452)
02.28.11 Ottawa County, Ohio (DA 11-382)
02.22.11 City of Suffolk, Virginia (DA 11-330)
02.08.11 TeleBEEPER of New Mexico, Inc. (DA 11-228)
02.07.11 Town of Wethersfield, Connecticut (DA 11-220)
02.07.11 Dallas Fort Worth International Airport Board (DA 11-219)
02.03.11 Commonwealth of Massachusetts (DA 11-203)
02.02.11 State of Indiana (DA 11-191)
02.02.11 County of Hinds, Mississippi (DA 11-194)
09.28.10 City of Parma, Ohio (DA 10-1836)
08.23.10 County of Hinds, Mississippi (DA 10-1589)
08.23.10 City of Hartford, CT (DA 10-1588)
08.19.10 County of Henry, Georgia (DA 10-1549)
08.19.10 State of Connecticut (DA 10-1548)
08.13.10 City of Virginia Beach, Virginia (DA 10-1525)
07.16.10 Liberty Communications, Inc. (DA-10-1318)
03.26.10 City of Billings, MT (DA-10-504)
03.26.10 Colorado CallComm, Inc. (DA-10-502)
03.26.10 City of Alexandria, VA (DA-10-501)
10.19.09 County of Charles, Maryland (DA 09-2252)
06.19.09 County of Flagler, Florida (DA 09-1371)
04.16.09 City of Houston, Texas (DA 09-852)
04.01.09 City of High Point, North Carolina (DA 09-745)
07.24.08 Washoe County & City of Sparks, NV (FCC 08-172)
01.14.08 Gemini International, Inc. (DA 08-79)
01.14.08 Kang B. Lee (DA 08-80)
11.20.07 City of Overland Park, KS (DA 07-4677)
09.27.07 Ron and Barbara Gossett (DA 07-4076)
09.17.07 State of Connecticut (DA 07-3947)
09.10.07 County of Charles, MD (DA 07-3881)
09.10.07 County of Calvert, MD (DA 07-3882)
09.10.07 City of Suffolk, VA (DA 07-3883)
09.07.07 State of Nevada (DA 07-3862)
09.07.07 City of Irving, Texas (DA 07-3861)
07.18.07 County of Chester (DA 07-3287)
07.18.07 City of Chesapeake (DA 07-3288)
07.03.07 City of Vacaville (DA 07-2949)
07.03.07 Washoe County (DA 07-2955)
06.14.07 City of Naperville (DA 07-2615)
06.14.07 State of Maryland (DA 07-2616)
05.11.07 County of Tazewell (DA 07-2058)
05.04.07 State of New York (DA 07-2000)
05.04.07 City of Manassas, Virginia (DA 07-1999)
05.04.07 Ron and Barbara Gossett (DA 07-1998)
04.26.07 County of Rockland, New York (DA 07-1864)
04.26.07 Kang B. Lee (DA 07-1869)
04.05.07 City of Boston, MA: Hearing Designation (DA 07-1631)
04.03.07 SM Leasing & Rental, Ltd. (DA 07-1581)
04.03.07 Gemini International, Inc. (DA 07-1580)
02.07.07 City of Boston, MA: Second Touches to Radios (DA 07-583)
12.20.06 City of Boston, MA (DA 06-2556)
11.03.06 Erratum to "Manassas City Public Schools - DA 06-2268" (DA 06-2103)
11.03.06 Montgomery County (DA 06-2268)
10.24.06 State of Maryland (DA 06-2104)
10.24.06 Manassas City Public Schools (DA 06-2103)
10.06.06 Chevron USA, Inc. (DA 06-1999)
05.08.06 The FCC Authorizes the TA to Extend the Mediation Period (FCC 06-63)

Back to top

FCC Orders Regarding Waiver Requests
Date Title
12.05.11 PSHSB addressed requests for waiver of the April 14, 2011 rebanding completion deadline in regions along the US-Canada border. (DA 11-1965)
10.03.11 PSHSB addressed non-border licensees’ supplemental requests for waiver of the rebanding completion deadline that were filed pursuant to the PSHSB’s December 30, 2010 Order (DA 11-1662)
03.31.11 PSHSB addresses Sprint Nextel's February 11, 2011 Request for Waiver of the requirement to vacate its Interleaved Band spectrum by March 31, 2011. Sprint Nextel had sought an extension of that deadline in 9 NPSPAC regions until until March 31, 2012. (DA 11-585)
02.08.11 State of Michigan (DA 11-226)
12.30.10 PSHSB addressed non-border licensees’ supplemental requests for waiver of the rebanding completion deadline that were filed pursuant to the PSHSB’s March 31, 2010 Order (DA 10-2431)
11.09.10 TA waiver request allowing NPSPAC licensees in Puerto Rico to relocate to the new NPSPAC band without waiting for Preferred Acquistion, Inc. (PAI) (DA 10-2167)
03.31.10 FCC Order (DA 10-574) addressing supplemental requests for waiver of the June 26, 2008 rebanding deadline
06.09.09 Supplemental Requests for Waiver of June 26, 2008 Rebanding Deadline (DA 09-1297)
07.14.08 Requests for Waiver of June 26, 2008 Rebanding Deadline (DA 08-1653)
06.30.08 County of Calhoun, Alabama (DA 08-1532)
06.30.08 National Capital Region Licensees (DA 05-1531)
06.19.08 Sprint Nextel Request for Waiver of June 26, 2008 Rebanding Deadline with Respect to Channels 1-120 (DA 08-1444)
06.17.08 Wave 4 Public Safety Regions (Non-Border) Request for Waiver (DA 08-1434)
06.17.08 Wave 4 Public Safety Regions (Non-Border) Request for Interim Waiver (DA 08-1433)
06.17.08 Wave 3 Public Safety Regions Requests for Waiver (DA 08-1432)
06.17.08 Wave 3 Public Safety Regions Requests for Interim Waiver (DA 08-1431)
06.17.08 Wave 2 Public Safety Regions Requests for Waiver (DA 08-1430)
06.17.08 Wave 2 Public Safety Regions Requests for Interim Waiver (DA 08-1429)
06.17.08 Wave 1 Public Safety Regions Requests for Waiver (DA 08-1428)
06.17.08 Wave 1 Public Safety Regions Requests for Interim Waiver (DA 08-1427)
02.04.08 State of Florida (DA 08-288)
01.17.08 State of Illinois (DA 08-124)
09.27.07 State of Minnesota (DA 07-4078)
06.26.07 Commonwealth of Pennsylvania (DA 07-2805)
06.05.07 County of Tompkins, New York (DA 07-2343)
04.27.07 Commonwealth of Pennsylvania (DA 07-1930)

Back to top

FCC Public Notices
Date Title
04.13.12 PSHSB extends 800 MHz application freeze for Wave 4 Border Area NPSPAC and Non-NPSPAC licensees along the U.S.-Canada Border until October 15, 2012. (DA 12-593)
03.30.12 PSHSB extends the negotiation period for Wave 4 NPSPAC (Stage 2) and non-NPSPAC (Stage 1) licensees in the U.S.-Mexico border region until July 2, 2012, and postpones the beginning of the mediation period for such licensees until July 3, 2012. (DA 12-501)
12.29.11 PSHSB extends the negotiation period for Wave 4 NPSPAC (Stage 2) and non-NPSPAC (Stage 1) licensees in the U.S.-Mexico border region until April 2, 2012, and postpones the beginning of the mediation period for such licensees until April 3, 2012. (DA 11-2087)
09.30.11 PSHSB extends the negotiation period for Wave 4 NPSPAC (Stage 2) and non-NPSPAC (Stage 1) licensees in the U.S.-Mexico border region until January 3, 2012, and postpones the beginning of the mediation period for such licensees until January 4, 2012. (DA 11-1652)
06.30.11 PSHSB again modified the schedule for Wave 4 non-NPSPAC (Stage 1) and NPSPAC (Stage 2) licensees in the U.S.-Mexico border region. The PSHSB extended the negotiation period until October 3, 2011 and postponed the beginning of the mediation period until October 4, 2011 for such licensees. (DA 11-1147)
04.08.11 PSHSB established procedures and provided guidance for Canadian Border Region (CBR) licensees to submit requests for waiver of the April 14, 2011 rebanding deadline. Bureau Extends U.S. – Canada Border Application Freeze Dates. (DA 11-644)
03.31.11 PSHSB again modified the schedule for Wave 4 non-NPSPAC (Stage 1) and NPSPAC (Stage 2) licensees in the U.S.-Mexico border region. The PSHSB extended the negotiation period until July 1, 2011 and postponed the start of the mediation period until July 5, 2011 for such licensees. (DA 11-583)
02.18.11 PSHSB provided information about the schedule for reconfiguration in the USVI, including timelines for planning, negotiation, and implementation and announced that the 12-month transition period for reconfiguration of USVI licensees will begin on March 21, 2011. (DA 11-316)
02.11.11 PSHSB released the attached Public Notice seeking comment on continued use of the old NPSPAC Mutual Aid Channels in the US-Canada border area. (DA 11-274)
12.30.10 PSHSB extended the negotiation period for Wave 4 non-NPSPAC (Stage 1) and NPSPAC (Stage 2) licensees in the U.S.-Mexico border region until April 1, 2011 and postponed the start of the mediation period until April 4, 2011 for such licensees. It also extended the filing freeze on new applications in the U.S.-Mexico border region until May 13, 2011 (DA 10-2442)
11.18.10 PSHSB announces application and licensing procedures for certian channels relinquished by Sprint Nextel Corporation in the 809.5-815/854.5-860 MHz band (DA 10-2201).
09.30.10 PSHSB extends 800 MHz rebanding negotiation period for Wave 4 Border Area NPSPAC and Non-NPSPAC licensees along the U.S. - Mexico Border (DA 10-1888)
09.15.10 Public Safety and Homeland Security Bureau Announces that the 18-Month transition period for 800 MHz Band Reconfiguration in Puerto Rico (Region 47) will commence on September 20, 2010 (DA 10-1739)
08.20.10 Public Safety and Homeland Security Bureau reinstates 800 MHz application freeze for Wave 4 border area NPSPAC and Non-NPSPAC licensees along the U.S.-Canada border (DA 10-1566)
06.30.10 PSHSB extends the mandatory negotiation start date until 10/01/10, the mediation start date until 10/02/10, and the application filing freeze date until 11/16/10, for Wave 4 licensees in the U.S.-Mexico border region (DA 10-1229)
06.25.10 FCC Public Notice (DA 10-1157) announcing enhancements to the TA's FRA Cost Metrics to provide more granular breakdowns of subscriber unit and number of repeaters of system size parameters.
06.24.10 FCC Public Notice (DA 10-1123) announcing the comment deadline (6/22/10) and reply comment deadline (8/6/10) for the Third Further Notice of Proposed Rulemaking regarding the 800 MHz band plan for the U.S. Virgin Islands.
03.31.10 PSHSB extends the mandatory negotiation start date until 7/01/10, the mediation start date until 7/02/10, and the application filing freeze date until 8/13/10, for Wave 4 licensees in the U.S.-Mexico border region (DA 10-573)
12.31.09 PSHSB extends 800 MHz Rebanding Negotiation Period for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Along the U.S.- Mexico Border Until April 01, 2010 (DA 09-2645)
10.28.09 Application and Licensing Procedures for Certain Channels Relinquished by Sprint Nextel Corporation in the 809.5-815/854.5-860 MHz Band
09.30.09 PSHSB Extends 800 MHz Rebanding Negotiation Period for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Along the U.S.- Mexico Border Until January 2, 2010 (DA 09-2144)
06.29.09 PSHSB Extends 800 MHz Rebanding Negotiation Period for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Along the U.S.- Mexico Border Until October 1, 2009 (DA 09-1463)
06.10.09 PSHSB Provides Additional Guidance for Submission of Supplemental Requests for Waiver of June 26, 2008 Deadline for Completion of 800 MHz Rebanding (DA 09-1310)
03.31.09 PSHSB Extends 800 MHz Rebanding Negotiation Period for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Along the U.S.- Mexico Border Until July 1, 2009 (DA 09-736)
03.18.09 WTB Certifies Two Additional Frequency Coordinators for the 800 MHz SMR Pool (DA 09-615)
02.10.09 PSHSB Provides Guidance for Licensing of 800 MHz Facilities on Post-Rebanding Channels that Previously Operated on Pre-Rebanding Channels Pursuant to Special Temporary Authority (DA 09-213)
02.10.09 Amendments to Regional Plans and Licensing of NPSPAC Facilities in the 806-809/851-854 MHz Band (DA 09-212)
12.29.08 Extends Negotiation Period For Mexico Border Area NPSPAC and Non-NPSPAC Wave 4 Licensees Until 04.01.09(DA 08-2811)
12.29.08 Application And Licensing Procedures For Channels Relinquished By Sprint in the 809-809.5/854-854.5 MHz Band (DA 08-2810)
10.10.08 30-Month Transition Period For Canada Border Regions to Commence on 10.14.08 (DA 08-2280)
10.01.08 PSHSB Extends 800 MHz Rebanding Negotiation Period for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Along the U.S.-Mexico Border Until January 1, 2009 (DA 08-2218)
06.30.08 Extends Negotiation Period For Mexico Border Area Wave 4 NPSPAC and Non-NPSPAC Licensees Until 10.01.08 (DA 08-1529)
05.06.08 PSHSB Grants Sprint Nextel's Request for Amendment of 800 MHz EA Licenses to Include NPSPAC Channels (DA 08-1074)
03.31.08 Extends Negotiation Period for Border Area NPSPAC and Non-NPSPAC Wave 4 Licensees Until 07.01.08 (DA 08-766)
01.17.08 Guidance for Requests for Waiver of June 26, 2008 Deadline for Rebanding Completion (FCC 08-23)
12.31.07 PSHSB Extends 800 MHz Rebanding Negotiation Periods for Wave 4 Border Area NPSPAC and Non-NPSPAC Licensees Until April 1, 2008 (DA 07-5110)
10.29.07 Erratum to DA 07-4392
10.29.07 Extends Negotiation Period Between Sprint Nextel and Border Area Wave 4, Stage 2 NPSPAC Licensees Until 01.31.08 (DA 07-4392)
10.03.07 PSHSB Creates PSHSB800@fcc.gov Email Address for Non-Docketed Rebanding Filings (DA 07-4149)
09.28.07 Extends Negotiation Period Between Sprint Nextel and Border Area NPSPAC Wave 4, Stage 1 Licensees Until 01.02.08 (DA 07-4038)
09.12.07 Supplemental Rebanding Completion Procedures and Guidance (FCC 07-168)
07.31.07 Extends Negotiation Period Between Sprint Nextel and Border Area NPSPAC Wave 4, Stage 2 Licensees Until 10.29.07 (DA 07-3468)
06.29.07 PSHSB Extends Negotiation Period Between Sprint Nextel and Border Area Non-NPSPAC Wave 4, Stage 1 Licensees Until 09.30.07 (DA 07-2878)
04.06.07 PSHSB Clarifies the Rights of 800 MHz Public Safety Licensees Electing to Remain in the 800 MHz Expansion Band (DA 07-1648)
03.30.07 PSHSB Extends Negotiation Period between Sprint Nextel and Border Area Non-NPSPAC Licensees in Wave 4, Stage 1 of 800 MHz Band Reconfiguration Until July 1, 2007 (DA 07-1542)
02.12.07 Guidance on Retuning Public Safety Non-Primary, Non-STA Licenses (DA 07-641)
12.29.06 Voluntary Negotiations for NPSPAC Region Wave 4, Stage 2 Licensees to Commence on 02.01.07 (DA 06-2618)
12.27.06 Extends Negotiation Period Between Sprint Nextel and Border Area Non-NPSPAC Wave 4, Stage 1 Licensees Until 04.02.07 (DA 06-2605)
12.20.06 Guidance on License Application and STA Procedures (DA 06-2555)
10.02.06 Reconfiguration Period in NPSPAC Wave 3 Regions to Commence on 11.01.06 (DA 06-1939)
06.30.06 Reconfiguration Period in NPSPAC Wave 2 Regions to Commence on 08.01.06 (DA 06-1371)
06.30.06 Band Reconfiguration Negotiation and Mediation Obligations for Channel 1-120 Wave 3 Licensees (DA 06-1370)
06.02.06 Reconfiguration Period in Non-NPSPAC Wave 4 Regions to Commence on 07.03.06 (DA 06-1183)
03.31.06 PSHSB Revises Start Dates for Negotiations Between Sprint and NPSPAC Wave 2 and 3 Licensees to 08.01.06 and 11.01.06 (DA 06-767)
03.03.06 Extends Start Date for Wave 4, Stage 1 Licensees Until 07.03.06 (DA 06-526)
01.31.06 PSHSB Offers Guidance to the Transition Administrator Regarding the Rebanding Timetable (DA 06-201)
01.31.06 Procedures for De Novo Review in the 800 MHz Public Safety Proceeding (DA 06-224)
12.30.05 Negotiation and Mediation Obligations for Channel 1-120 Wave 1 Licensees (DA 05-3355)
12.30.05 Voluntary Negotiations for NPSPAC Wave 1 Licensees to Commence on 02.01.06 (DA 05-3348)
12.02.05 Reconfiguration for NPSPAC Wave 3 Licensees to Commence on 01.03.06 (DA 05-3134)
09.02.05 Reconfiguration for NPSPAC Wave 2 Licensees to Commence on 10.03.05 (DA 05-2390)
05.27.05 Reconfiguration for NPSPAC Wave 1 Licensees to Commence on 06.27.05 (DA 05-1546)
05.11.05 Application Freeze Process For Reconfiguration (DA 05-1340)
05.03.05 WTB Certifies an Additional Frequency Coordinator for the 800 MHz SMR Pool (DA 05-1157)
03.11.05 WTB Approves the TA RPP's Basic Reconfiguration Schedule (DA 05-619)
03.09.05 WTB Certifies Frequency Coordinators for the 800 MHz SMR Pool (DA 05-608)
10.29.04 WTB Selects Transition Administrator (TA) (DA 04-3492)
09.10.04 WTB Transition Administrator Search and Criteria (DA 04-2963)

Back to top

Filings in WT Docket 02-55
Link to the FCC's Wireless Telecommunications ("WT") Docket 02-55.

Back to top

TA Policy Documents
Link to the TA Policy Documents section of the website, which includes TA Implementation Plans, Regional Prioritization Plans, and other rebanding policy documents.

Back to top

   © 800 MHz Transition Administrator, LLC 2012. All rights reserved.